Build Showcase

Inside a 4,004 sqft Post-Frame Barndominium in Merlin, Ontario

Merlin, Ontario

Inside a 4,004 sqft Post-Frame Barndominium in Merlin, Ontario

Location

Merlin, Ontario

Living Area

4,004 sqft

Beds

5

Baths

5

Slab

Slab-on-grade with 5-zone radiant in-floor heat

The 4,004 sqft post-frame barndominium engineered and built in Merlin, Ontario — the reference project behind the IronField planning system, featured in Plumbing & HVAC Magazine and The Drive Magazine.

This is the build that started IronField. The IronField founder designed, engineered, and built it as both the builder and the mechanical contractor — a 4,004 sq ft post-frame barndominium in Merlin, Ontario that became the reference project behind the entire IronField planning system.

Systems-first, from the slab up

Every mechanical decision on this build was made before the concrete was poured. The result is a home where the systems drive the floor plan, not the other way around:

  • 5-zone radiant in-floor heat across the living space
  • Hybrid heating — an air-source heat pump paired with an IBC combi-boiler
  • HRV ventilation for balanced, filtered fresh air
  • A fully heated and cooled shop integrated with the living envelope
  • Smart-home automation and full air-quality monitoring
  • Perma-Column foundation construction
  • A 600 ft French drain system engineered for long-term water management

Why it matters

On a slab-on-grade build, the slab is permanent. Plumbing rough-ins, radiant loops, electrical conduit, and anchor placement all have to be right the first time — there is no basement to go back into. Mapping every one of those decisions ahead of the pour is exactly what the IronField pre-pour checklist was built to do.

The build has been featured in Plumbing & HVAC Magazine and The Drive Magazine as a case study in mechanical-first rural construction.

Slab & Foundation Details

Radiant PEX loops laid on rigid insulation, with all plumbing rough-ins, electrical conduit, and floor drains positioned and verified before the pour — plus a perimeter thermal break and a full under-slab moisture barrier.

Built by

IronField (GC & Mechanical)

Visit builder

Planning a build like this?

Every decision in a build like this is made before the slab is poured. Start with the free pre-pour checklist, then unlock the full 525-item planning system when you're ready.